|
Automotive Industry Hall
Mounting Parts and Logistic
Location:
Győr, Hungary
Principal:
AHM Kft.
Architect:
OPB / Óbuda Újlak
Engineering:
APSE Kft. (permission documentation, execution drawings)
Structural tasks:
Structural design of two level hall with 10 500 m2 area and a one level hall with 2000 m2 area. Precast reinforced concrete skeleton. 20-24 m span length. TT slab with 10 kN/m2 live loading capacity. Pile foundation.
Planning:
2011
Realisation:
2011-2012
Contractor:
KÉSZ / Market
|